C.Cutler Wrote:
-------------------------------------------------------
> 1. Awesome photos!
> 2. I'm not familiar with the MILW operations; why
> is there just 1 electric engine and 4 diesels on
> the train, instead of using all electrics? Is
> there a capacity power limit on the overhead lines
> that would prohibit that?
They could run more electrics if they wanted to.. How about four big box cabs in the front and four more in the middle of a train ?? That is a LOT of AMPERES in a relatively short length of wire..
Also, the Diesels were designed to MU with the electrics, so only ONE engineer was required for the train.