Re: Feather River
Author: been there
Date: 07-26-2021 - 19:47
M. Harris Wrote:
-------------------------------------------------------
> FRA requires active rail bridges which are part of
> the general railroad system be inspected at least
> once in every calendar year. Things like
> flammable brush and trees would be expected to be
> noted as requiring some mitigating action if they
> pose a fire hazard. At some point I would expect
> the inspection records to be reviewed to see if
> brush and tree removal was addressed.
When the glowing fire embers are carried by the wind brush removal directly under and beside the bridge is a moot point. It's an interesting thread but the actual damage to structures may be far less than you think. If the bridges and tunnels are saved the damage to track could be as simple as tie replacement. BNSF will not tolerate north - south coast traffic routed via Denver for long.