Almost the entire length of the SP&S was relocated along the Columbia River due to the dams being built. IIRC, the line is as much as 40' above the original ROW. Although the stages are not clear to me about how many ROW's were created during the construction of the dams along the Columbia River, there MAY have been as many as four in some sections. The UP was not as affected on the other side of the river by the dam construction.