Dr Zarkoff Wrote:
-------------------------------------------------------
> . . .
>
> The periodic (and random) safety-sensitive testing came to pass as a result of an accident almost a year to the day later when a stoned tower operator on the NEC lined a clocker onto a section of main track which was out of service and occupied by a M/W gang. The train ran over a ballast regulator, derailed, and went down the bank at some 90 MPH (the engineer survived).
Thanks, Dr Zarkoff.
These seem to be reports of that event:
Collision of Amtrak Train 66, The Night Owl with on-track maintenance- of-way equipment: [
www.ntsb.gov]
24 Hurt as Amtrak Train Derails; Key Rail Operator Leaves Scene: [
www.nytimes.com]
Google search [nec train accident 1988 tower]: [
www.google.com]