I not sure why SMART ( oxymoron) and NCRA/NWP cannot come to agreement as ESPEE99 states a 4 day operating window would work based on the current volume of traffic or even the anticipated volume of traffic with a 3 day a week operation cut back to 2 trips during the construction.
NWP will be operating at night once SMART starts anyway as temprol seperation is the best option along with the very costly PTC.

Starting in September of 2004 and Ending in December of 2005 the CCT Main line was rebuilt from 70lb and 75lb rail and very poor ties with minamal ballast between Stockton and MP 14.2 at Guild ( Lodi)CA. Operations to the Customer continued during the entire recconstuction of the line. This line handles many more carloads than the New NWP for a long time.

Every Thursday the line was removed from service after the Local went north to Lodi and a a 1/2 mile of track was removed and right of way graded and filter fabric was placed down and ballast and ties placed and the heavier 130 to 136lb rail was put in place and the track was placed back in service at 1600 on Monday, the contactor then worked a window from 0600 to 1400 tuesday and Wednesday to tamp and dress the newly installed track. Almost every road crossing was replaced with new concrete crossings and ROW drainage was improved and vegitation was cleared.

CCT would leave the a locomotive in Lodi on Thusday night and then take the crew to Lodi on Friday to switch the industries with car brought in during the week. This allowed the customers to have a switch 5 days a week and not effect the operations. Outreach was done with the customers and the cities and coutny. The customers bought into the program and CCT business actually increased over the year before due to good communication and better service.

On Monday CCT would take another Locomotive and cars interchanged on Friday and Sunday to Lodi from Stockton and work the customers taking the loads pulled out on Friday and Monday back for interchange. Both Union Pacific and BNSF cooperated to expidiate the traffic that had been delayed on Friday.

A rebuild can be done and still provide service to customers and as the Lodi line rebuild found out in most cases a delay of a day or two on a rail load is not the end of the world. CCT adhered to the constuction window during the whole process and in the end the cusotmers never had a complaint and now they have a a railroad serving them with FRA class 4 track (59 mph for passenger if there were any, 40 mph freight) CCT operates it as FRA class 2 track (25/30 mph) as the CCT does not need to rocket to Lodi at 40 mph when 25 mph saves fuel and track wear and only save about 16 minutes each day.

After reading for the past few years about SMART and the NCRA I do not think there is anyone there who could switch there way out of a wet paper bag. The good folks at the New NWP are railroaders and if allowed by the fumbling, bumbling bureaucrats at NCRA and SMART to make a plan it might just work and still serve the few customers NWP now has.



Subject Written By Date/Time (PST)
  SMART Claims NWP Willing to Forgo Freight George 07-23-2011 - 14:14
  Re: SMART Claims NWP Willing to Forgo Freight Scott Schiechl 07-23-2011 - 14:51
  Re: SMART Claims NWP Willing to Forgo Freight Mike Pechner 07-23-2011 - 15:04
  Re: SMART Claims NWP Willing to Forgo Freight Short line guy 07-23-2011 - 16:55
  Re: SMART Claims NWP Willing to Forgo Freight Espee99 07-23-2011 - 20:22
  Re: SMART Claims NWP Willing to Forgo Freight CCTGUY 07-23-2011 - 21:09
  Re: SMART Claims NWP Willing to Forgo Freight Shortline Sammie 07-24-2011 - 08:56
  Re: SMART Claims NWP Willing to Forgo Freight Capdiamont 07-24-2011 - 07:41
  Re: SMART Claims NWP Willing to Forgo Freight SP Marketing 07-24-2011 - 15:52


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 **     **  ********  ********   **    **  **     ** 
 **     **  **        **     **  **   **   **     ** 
 **     **  **        **     **  **  **    **     ** 
 **     **  ******    ********   *****     **     ** 
  **   **   **        **         **  **     **   **  
   ** **    **        **         **   **     ** **   
    ***     **        **         **    **     ***    
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com