The P&L is a line crying to be run at higher speeds (if it had better ties). The 1-degree curve that the new McCoy elevator lead turnout was dropped into had over 3 inches of superelevation which had to be transitioned out. I have seen photos of some nice WSU Football Special passenger trains back in NP days that probably rolled along at some nice speeds at that time.



Subject Written By Date/Time (PST)
  Port of Lewiston coal port thread corrections-RE: P&L flood damage etc. Throttle Hogg 08-21-2014 - 22:48
  Re: Port of Lewiston coal port thread corrections-RE: P&L flood damage etc. David Smith 08-22-2014 - 14:01
  Re: Port of Lewiston coal port thread corrections-RE: P&L flood damage etc. David Smith 08-22-2014 - 14:06
  Re: Port of Lewiston coal port thread corrections-RE: P&L flood damage etc. Matt Farnsworth 08-22-2014 - 15:29
  Re: Port of Lewiston coal port thread corrections-RE: P&L flood damage etc. Budd 08-22-2014 - 15:48
  Re: Port of Lewiston coal port thread corrections-RE: P&L flood damage etc. hep 08-22-2014 - 21:43
  Re: Port of Lewiston coal port thread corrections-RE: P&L flood damage etc. Spike 08-24-2014 - 19:49


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 ********  **    **  **     **  **    **        ** 
 **         **  **   **     **   **  **         ** 
 **          ****    **     **    ****          ** 
 ******       **     *********     **           ** 
 **           **     **     **     **     **    ** 
 **           **     **     **     **     **    ** 
 ********     **     **     **     **      ******  
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com