Re: The High Price of Precision Scheduled Railroading
Author: J M STARR
Date: 10-18-2023 - 14:20
Not to nit pick, but on the 1st and 2d subdivisions of the WP, the sidings were not bonded and entry into a siding was on a red over yellow signal indication. On the 3d subdivision, the sidings were bonded and the signal indication to enter a siding was red over green if the siding was clear.