Re: Donner Pass Track #1
Author: WAF
Date: 01-23-2013 - 11:32
OTN Wrote:
-------------------------------------------------------
> Removal of Main line track between Switch 9 and
> Shed 10 and the removal of the No. 1 track
> eliminating double track from Norden to Shed 47 at
> the summit of the longest grade leaving a 2 mile
> long tunnel as the only way across seems
> senceless.
> Put the 7 cars at Colfax a couple of days ago at
> MP 194.3 (center of T-41) and see how much the
> No.1 track is missed.
> This decision was made by a "Flatlander" from a
> "Water Level" railroad.
Or inside T35 at Yuba Pass...Bunker mentality